The Staller Center for the Arts was built in the mid-1970's. SUPERSTRUCTURES was retained to design an entirely new replacement curtain wall system, entry doors and new ceilings. Architectural, structural engineering and cost estimating services were provided along with management of a consulting MEP firm providing services in connection with sprinklers and lighting and an environmental consultant addressing asbestos and lead paint. For the curtain wall system the firm conducted a comparative analysis evaluating options on the basis of adaptability to existing conditions, cost, and ability to meet construction code standards on energy efficiency and monitored laboratory air and water testing.
14 Wall Street, 25th Floor, New York, NY 10005
(212) 505 1133
info@superstructures.com
Subscribe to SuperScript, our email newsletter.